Service · NOM-020-STPS

NOM-020-STPS consulting: pressure vessels

Categorized inventory, complete per-equipment files and review-ready evidence — for facilities in Tijuana, Ensenada, Tecate and Mexicali.

WhatsApp

In context

NOM-020-STPS-2011 regulates pressure vessels, cryogenic vessels and steam generators (boilers) operating in workplaces. If your facility runs compressors, air tanks, autoclaves, boilers or pressure/vacuum lines, it very likely applies — and it's one of the first standards an STPS inspection looks at.

Our job is to leave your inventory categorized, every piece of equipment with a complete file, and the evidence organized so a review doesn't depend on anyone's memory. We don't fabricate records: we organize, complete and leave requirement-to-file traceability.

What NOM-020-STPS requires

  • Equipment list and categorization

    Every pressure/vacuum asset, classified as category I, II or III by its fluid, the set pressure of its safety valve and its volume.

  • Per-equipment file

    General data, specifications or design calculations, and repair/modification history.

  • Operation, maintenance and review programs

    With records proving they actually run.

  • Notice to the STPS

    Category III equipment needs a verification unit's compliance opinion and a notice to the STPS, which assigns it a control number.

  • Periodic tests and examinations

    Pressure tests or non-destructive examinations at least every five years for category II and III equipment.

  • Trained personnel

    Training evidence for the people operating the equipment.

The NOM-020 package

Document control, logs and traceability designed to withstand review.

Deliverables

  • Gap assessment (by requirement)
  • Action plan (owners/dates/closure criteria)
  • Evidence index (req → file → location → rev)

What we need from you

  • Equipment/RSP inventory
  • Existing docs (if any)
  • Audit date (if any)

Typical timeline

7–15 business days (scope-dependent)

How we work

No noise: three verifiable phases. Deliverables defined before starting.

  1. Step 1: Assessment

    Operation + evidence + gaps prioritized by impact and urgency.

  2. Step 2: Order + traceability

    Structure, versions, records, full evidence index.

  3. Step 3: Verifiable closure

    Open items closed by criteria. Package audit-ready.

NOM-020 frequently asked questions

Pressure vessels (air tanks, autoclaves, heat exchangers), cryogenic vessels and steam generators/boilers. Any asset operating above/below atmospheric pressure or under vacuum should be evaluated.

The standard classifies each asset by its fluid, the set pressure of its safety valve and its volume. The category defines the obligations: category I is controlled with a list, a file and inspections; category II adds maintenance programs and pressure tests at least every five years, and category III also needs a verification unit's compliance opinion and a notice to the STPS.

We can include vessel inspection and pressure/vacuum calculations depending on scope. Where an accredited inspection body is required, we coordinate the service and organize the resulting evidence.

We start with a rapid assessment within 24 hours and prioritize by risk. In many cases critical open items close in 7–15 business days, depending on inventory.

A rough count of pressure/vacuum equipment, the plant's city, and the audit date if there is one. We quote within 24–48 hours with a written scope.

Let's talk about your next audit.

Tell us about your case. Within 24–48h you'll receive a written scope with deliverables, timeline, and pricing — no commitment.

WhatsApp

If you're not sure which service fits, we quote the minimum viable scope.