Service · Sampling & measurements

Sampling & measurements: gases, perimeter noise and static electricity

One sampling plan, coordinated labs, and results interpreted against the standard.

WhatsApp

In context

Periodic measurements — combustion gases, perimeter noise, ground resistance and static electricity (NOM-022-STPS) — tend to be scattered across several providers and end up as loose PDFs nobody interprets. In a review, a result with no analysis or follow-up is worth little.

We build a single sampling plan per requirement, coordinate the lab and chain of custody, interpret every result against its applicable standard, and close with evidence: what was measured, what it showed, what was corrected.

What we cover

  • Sampling plan per requirement

    What to measure, at which points, how often, and against which standard.

  • Combustion gases

    Coordination of measurements on combustion equipment and result analysis.

  • Perimeter noise

    Measurements at property lines and interpretation against the applicable limits.

  • NOM-022-STPS

    Ground resistance, lightning rods and static electricity control, with periodic records.

  • Lab and chain of custody

    Accredited providers — or yours — with documented custody.

  • Evidence-based closure

    Out-of-limit results with an action plan and verification.

The measurements package

Coordination and interpretation of measurements: combustion gases, perimeter noise and ground resistance / static electricity (NOM-022-STPS). Backed results and documented closure.

Deliverables

  • Sampling plan + lab coordination
  • Results interpreted against the standard
  • Evidence-based closure + actions

What we need from you

  • Sources / points to monitor
  • Result history (if any)
  • Site access window

Typical timeline

2–6 weeks (lab-dependent)

How we work

No noise: three verifiable phases. Deliverables defined before starting.

  1. Step 1: Assessment

    Operation + evidence + gaps prioritized by impact and urgency.

  2. Step 2: Order + traceability

    Structure, versions, records, full evidence index.

  3. Step 3: Verifiable closure

    Open items closed by criteria. Package audit-ready.

Measurements frequently asked questions

Combustion gases, perimeter noise, ground resistance and static electricity (NOM-022-STPS), plus the water and emissions sampling from our other services. All under one plan.

Control of static electricity in workplaces: grounding systems and lightning rods where applicable, with periodic resistance measurements and records backing them.

Yes. If you already have a lab or measurement provider, we coordinate with them; if not, we propose accredited options.

The finding is documented, the correction is defined with closure criteria, and a verification measurement is scheduled. The file tells the whole story.

Typically 2 to 6 weeks, depending on the lab's schedule and site access.

Let's talk about your next audit.

Tell us about your case. Within 24–48h you'll receive a written scope with deliverables, timeline, and pricing — no commitment.

WhatsApp

If you're not sure which service fits, we quote the minimum viable scope.